Flagler Sewer System
Flagler built twelve-inch sewer system for the hotels that simply drained into the Matanzas River.
People along the sewer line had the option of tapping into it. Sewer gas traveling back up the pipes
was a common problem, especially for the hotels in summer when water in the traps would dry out.
The solution to this problem was flushing out the sewer system with artesian well overflow. The city
finally made a sewer system by December 10, 1902.
Flagler Construction 1885 to 1890
Flagler Era 1890 to 1900
Ponce de Leon Hotel
Ponce de Leon Entrance
Ponce de Leon Rotunda
Ponce de Leon Grand Parlor
Ponce de Leon Dining Room
News Article of 1889 opening
Signor Jovine - 1889 Singer
The Fame of the Ponce de Leon Hotel
Chemist at the Ponce de Leon Hotel
Count Prokaski
Harry Flagler Takes Charge of Hotel
Osborn Seavey
Robert Murray
Flagler Sewer System
Flagler Laundry
Flagler Statute
Artists Who Created Hotel
Carrere and Hastings
McDonald and McGuire
Clarence B. Knott
Ponce Studio Artists
Cuban Giants at Ponce de Leon Hotel
Reception for Mrs. U. S. (Julia) Grant at
the Ponce de Leon Hotel
William J Hammer
Electricity in St. Augustine
Seavey House
Henry Morrison Flagler
Casino
Alcazar Hotel
Casa Monica or Cordova
Flagler Hotel Competition
Joseph Greaves
Coast Guard Alters the Ponce de Leon Hotel
Ida Alice
Florida East Coast Railroad
Memorial Presbyterian Church
Grace United Methodist Church
St. Augustine Cathedral
Ancient City Baptist
Alicia Hospital
Kirkside
 
   
Custom Search
Like us on Facebook